Integrated Design-Build: Why Single-Source Accountability Matters
Traditional project delivery separates design and construction, creating coordination gaps and budget overruns. Integrated design-build brings both under one contract, eliminating these risks.
The Problem with Traditional Delivery
Design is finalized before construction begins, meaning constructability issues are discovered late. Architect and contractor are separate entities, creating coordination gaps. The client manages multiple contracts, increasing complexity.
How Integrated Design-Build Solves This
Design and construction teams work in parallel. Early constructability reviews allow value engineering before design is locked. Transparent budget and schedule management provide real-time updates. Single-point accountability simplifies decision-making and reduces risk.

